Task 8 - Monitor and evaluate

Contents in this section:

CHECK

A monitoring and evaluation framework should be developed to track the effectiveness of the ASM management approach and mitigation measures.

Task 8 – Monitor and evaluate

A monitoring and evaluation framework should be developed for ASM-related impact and risk mitigation. As part of SHIRA, the implementation of controls should be monitored, and their effectiveness should be evaluated so that corrective action can be taken where needed. An example is provided in Table 4K.7.

Long-term objectives identified as part of Review and Planning (Section 2) may also relate to ASM management, in which case a monitoring and evaluation framework should also be developed to track progress against the long-term objectives (see Section 2).

Sites should also develop indicators for monitoring of and tracking changes in the ASM context or its dynamics on an ongoing basis, such as the location of ASM activities, the number of ASM stakeholders involved, what type of ASM activities are being conducted, and changes in grievances or incidents related to ASM.

TABLE 4K.7: Example KPIs

Potential Impact or Risk Controls Target Control Owner Timeline Inputs Implementation Check Outputs Outcomes Effectiveness
Describe the potential impact/risk List the Controls

What are we trying to achieve? List function responsible for the Control Date the Control should start and be competed Human and financial resources needed to implement the Control How do we know that the controls are being implemented? Outputs produced Changes that have occurred as a result of Control - Include sources of verification Value and success in managing the impact - Include sources of verification
Example: Injuries or fatalities of employees, contractors and ASM stakeholders related to ASM activity on the site’s concession area

Site security measures aligned with VPSHRs



Zero injuries or fatalities of employees, contractors and ASM stakeholders related to ASM activity on site concession area

Security





Start date, end date Staff time spent in training

$ spend on consultant/ trainer

Costs of venues, materials, logistics
Due diligence/security risk assessment report finalised

Guidelines and procedures established or updated

Training logs and evaluation show training has been conducted

Engagement logs show engagements have taken place
All staff and contractors, and public security are aware of VPSHR requirements

MOU with public security forces



VPSHR followed by all private and public security staff

Verification: Incident log, independent evaluation results





Reduction of injuries or fatalities of employees, contractors, or ASM stakeholders related to ASM activity on the permit area

Verification: Incident and grievance register – number of ASM related incidents/ grievance before and after control implementation
Emergency preparedness and response system in place that includes ASM-related emergencies S&SD Start date, end date

Staff time developing process, training, and implementing

$ spend on consultant



EPRP updated to include risks relating to ASM

Training logs show training about EPRP to staff and contractors provided

Necessary equipment/material in place

Engagement/ communication logs show necessary awareness raising done of ASM actors

Staff and contractors aware of their roles/ responsibilities for emergencies in relation to ASM

XX number of staff capable of administering first aid







All staff and contractors demonstrate ability to execute their roles in emergency scenario

Verification: emergency response drill evaluations

Improve safety of ASM structures and activities on site and continuously monitor the safety of ASM structures and activities, for example to detect risks of wall/tunnel collapse

S&SD

Social Performance
Start date, end date Staff time and $ costs of equipment and material

Staff time and $ costs for developing and implementing SED programme

Staff time and $ costs for assessing safety risks related to ASM activities
Targeted SED programme developed and implemented

Training logs show XX people reached with awareness raising events or trainings

System for data collection on ASM workings on permit area is in place

Risk assessment report of ASM activities available
Data collection on ASM workings on concession area is collected, analysed and acted upon regularly

ASM operator aware of health and safety standards for mining activities and infrastructure
ASM activities conducted in line with health and safety standards

ASM infrastructure built in line with health and safety standards

Verification: inspection, M&E reports



Engagement with ASM leaders and community, including awareness-raising on key safeguarding measures to take in operations As above Social Performance Start date, end date Staff time and $ costs for developing and implementing SEP programme

Engagement logs show engagements have taken place Community agreement to, and mobilisation plan developed for, X,Y,Z safety measures to be taken at site Implementation of X,Y,Z safety measures
4K.2 Guidance | Check